1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes

Product Details
After-sales Service: 24h Online
Warranty: 90 Days
Type: Welded
Still deciding? Get samples of US$ 0/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
10000000 RMB
Plant Area
101~500 square meters
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
  • 1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
HXSCA001
Section Shape
Round
Od
48.3mm
Wt
2.0-4.0mm
Length
6m or Customized
Zinc Coating
40g-600G/M^2
Delivery Time
15-25 Days
Transport Package
Standard Exporting Package
Trademark
HONGXIN/HUAXING
Origin
China
HS Code
7306309000
Production Capacity
50000ton/Month

Product Description

Product Parameters
Section Shape Round
Standard GB/T13793, GB/T3091, GB/T700, ASTM A53, EN39, BS 1387, JIS3444
Grade Q235,Q345,  A53-A, A53-B,S235, S275, S355, STK 400, STK 500
Technique ERW
Length 6m or customized
Wall Thickness 2.5-  4.0mm
Outer Diameter Normal 1-1/2"
48.3mm, can be required
zinc  coating Pre-galvanized : 40-120g/m2;
Hot dipped galvanized : 200-600g/m2  (or customized)
Surface Oiled, Painted,Gavanized, as customer's requirement
Ends Plain and beveled ends with plastic caps / threaded both ends with coupling and caps / grooved ends.  
Usage Construction & Structure
Trade terms FOB, CFR, CIF
Payment terms 30% T/T deposit and 70%T/T against copy of B/L , 100% L/C at sight, others can be negotiated
Delivery time 7-15 in stock, 15-25 days (based on quantity) 
Package In hexagonal seaworthy bundles packed by steel strips, With two nylon slings for each bundles
 
Detailed Photos
 
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
 
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
 
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes



 
Packaging & Shipping

Packaging Details
1. In bundle with strip 
2. By PP Woven material and anti-water plastic 
3. As the customer's requirement.
   
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes


 
Company Profile
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
 Why choose us?
 
 . Our factory is in Bazhou, which is very famous for specializing in the production of thin-walled pipes.
 . 20 Years of Experience in Steel Manufacturing
 . All Customizable to Fit Your Needs
 . Large Stock for Fast Delivery
 . High Standards of Quality Control
 . Comprehensive After-Sales Service Guarantee
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
1.5 Inch 48.3mm Q235safe Scaffolding Structure/Buliding/Construction High-Strength Steel Pipes
 
   
FAQ


Q1.Are you are trade company or manufacturer?
We are a company integrating industry and trade. Our own factory was established in 2004.

Q2.Can you provide free example?
Yes, the regular sample will be provided at any time, and customized samples will take about 5-7 days to produce.

Q3.What is your payment terms?
Our usual payment term is 30% T/T deposit and 70%T/T against copy of B/L , 100% L/C at sight, others can be negotiated.

Q4.How can you guarantee what I got will be good?
We are factory with 100% predelivery inspection which guarantee the quality. And as Diamond member and audited supplier on Made-in- China. If the product is found to have quality problems within 90 days after receiving the goods, we will solve and compensate for you.

Q5.Can I have my own logo on the product?
Of course! we provide diversified services, it includes customized packaging, customized logo, graphic customization.

Q6.Can I request the third party inspection before shipment?
Our products have been approved by the third party inspectors such as CSI .SGS, BV etc, you can arrange  inspection as you like.

Contact us

Corry Chang

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier